Skip to main content
June 1, 2023 - May 1, 2024
Team WyfoCommunity's avatar
June 1, 2023 - May 1, 2024

WyfoCommunity

Wyland Foundation

Points Total

  • 0 Today
  • 0 This Week
  • 10,703
    Total

Team Impact

  • up to
    58
    meatless or vegan meals
    consumed
  • up to
    367
    pounds of CO2
    have been saved
  • up to
    0.4
    kWh
    energy saved
  • up to
    359
    plastic bottles
    not sent to the landfill
  • up to
    170
    plastic straws
    not sent to the landfill
  • up to
    102
    pounds of trash
    have been saved
  • up to
    5.0
    pounds hazardous waste
    eliminated from waste stream
  • up to
    2.8
    pounds pesticide and excess fertilizer
    prevented from entering watersheds
  • up to
    20,349
    gallons of water
    have been saved
  • up to
    322
    gallons
    polluted water runoff prevented
  • up to
    8.0
    water collection systems
    installed
  • up to
    1.0
    square feet
    community beautification
  • up to
    28
    hydrozones
    created
  • up to
    8.0
    trees
    planted

Team Feed

Recent updates from this team
  • November 14 at 9:49 AM
    Will address my water conservation challenge at a future date. Other renovations in the house are proceeding.
  • April 30 at 4:42 PM
    It's been going well. I've reduced my water usage. I'm not watering the lawn as frequently.
  • April 28 at 7:15 AM
    Contaminates from the neighborhood that enters our storm drains is any garbage in the gutters along the curb. I have seen paper and plastic trash along with leaves and brush. Sometimes paint and oil also enter the storm drains. I encourage all neighbors to park in the driveway on street sweeper days so the street sweeper does it's job and...
  • April 28 at 7:12 AM
    Today, I do collect water during days of rain. I have 15 five (5) gallon buckets with handles and when it rains water runs off my roof in several places. I fill all 15 of my 5 gallon bucks two to four times depending how long and how hard it rains. Next I pure the 5 gallon buckets of rain water through a filter as the roof has dirt and soot....
  • April 23 at 4:05 AM
    My volunteer water project begins today in Love the City of Fullerton. 
  • April 23 at 4:04 AM
    I dug up a pvc T-section in the front yard. I went and purchased new PVC parts and cut out the leaky fitting and installed the new fittings. I waited 85 minutes and turned the water on to discover the leak was fixed. I covered the hole and replaced the parts of the lawn. This inspired me to change out six sprinkler heads in the flower beds from...

145 Team Members

Recently active team members

Competitions

Challenger Members Points Challenged Members Points  
Challenger: fighters Challenger Team Members: 1 Challenger Points: 910 Winning?: VS. Challenged: WyfoCommunity Challenged Team Members: 145 Challenged Points: 10703 Winning?: